Freephone: 0800 432 0380
E-mail: info@extremeaccess.co.uk

Painting

Painting of Crittle windows, Block.

Date:  2007- 2008

Location: Central London.

Duration: 8 Months - Split over 2 years 

Complete rub down and full overhaul of crittle windows on 9 story block.

Spacer - ignore

Download Brochure

Contact Us

Our second major project at the Cloisters was to fully refurbish all exterior window frames this entailed a full rub down to metal work. Next to remove and reinstate any corroded or damaged putty work followed by the application of a dulux metal work primer /undercoat paint. Finally the application of two coats of dulux weathersheild top coat gloss.

Sections of the building were targeted for work so as to keep disruption to a bare minimum, the team progressively worked around the building completing section at a time. This method worked very smoothly and we encountered no set backs. 

The window frames were in a huge and obvious state of disrepair, all concerned were extremely pleased with the finished product.

Top of Page / Home / Services / Latest Projects / News / About Us / Contact Us
Registered in England and Wales. Address: Extreme Access Ltd, 15 Abbeville Mews, 88 Clapham Park Road, London, SW4 7BX

Website by Arkios Consulting