Projects / Banner Installs / Building sign installation


Banner Installs

Building sign installation
Date: 25th Feb 2008.
Location: Slough Trading Estate.
Duration: 1 Day.
Installation of company logo to industrial building.

Extreme Access was required for this job due to the awkward nature of the sign’s position.
About 18ft beneath the sign and to either side of the sign was a soft sloping roof. This meant that any other form of access was out the question.
Using simple rope access techniques, the sign was installed quickly and safely.